We use cookies to give you the best experience on our website. By continuing without changing your settings we will assume that you are happy to receive all cookies from our site. You can read more about how we use cookies here

Contact Us

Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input

This system, which generates enough output to heat a primary School or Cottage Hospital, is heating the production site at Whittaker Engineering. Two ETA HACK 350 boilers work in cascade...

700kW ETA Biomass System Operational

700kW ETA Biomass System Operational at Whittaker Engineering

Jamie Adams (Glendevon Energy Sales Director) was joined by Colm Lawlor and Richard Allan (Head of UK Sales and Head of Scottish Sales for ETA’s UK distributor Innasol) to hand over this dual cascade HACK 350 Wood Chip system to Ken Whittaker of Whittaker Engineering in Stonehaven.

The system, which generates enough output to heat a Primary School or Cottage Hospital, is heating the production site at Whittaker Engineering.  This includes 3 factory floors, offices and a workshop.   Two ETA HACK 350 boilers work in cascade to deliver up to 700kW of heat, via two :4000L buffer tanks.  Whittaker Engineering have designed and built a new plant room and wood chip store to house the boilers and bespoke feed system.  The chip store is locate above the boiler room to crucially minimise the plant foot print.  The system uses 3 vertical filling augers to load the chip into the store and minimise time the delivery lorry is in the yard area.  An agitator with dual auger extract system then fuels the boiler via two drop chutes to the boilers below.  

Colm Lawlor, Innasol National Sales Manager comments “Having installed this the first 700kw ETA HACK 350 biomass twin boiler cascaded system in Scotland we at Innasol can only echo the praise given for the team at Glendevon Energy. As a key member of the Innasol Customer Excellence Installer programme they have certainly delivered an excellent project here at Whittaker Engineering, helping to reduce their energy costs and carbon emissions....great job well done.

 

Contact our team on 01577 840579 or This email address is being protected from spambots. You need JavaScript enabled to view it. to discuss how Glendevon Energy can meet your requirements

 

APPROVED INSTALLERS